Building and expanding liquefied natural gas facilities requires extensive use of heavy equipment. Excavators, loaders, forklifts, telehandlers, bulldozers, dump trucks, compactors, and other machines move earth, materials, pipe, structural components, and equipment throughout the project.
The combination of large equipment, restricted visibility, changing traffic patterns, uneven ground, and multiple contractors can create serious risks. Workers may be struck, pinned, crushed, run over, or caught between machinery and fixed objects. Heavy-equipment hazards also overlap with the broader risks associated with LNG plant accidents, particularly during large construction and expansion projects.
An LNG plant accident lawyer investigating a serious equipment injury may need to determine who controlled the work area, whether the operator could see the worker, what traffic controls were in place, and whether the equipment was properly maintained and appropriate for the task.
Heavy Equipment Creates Constant Movement Across LNG Projects
Large LNG construction sites are active environments. Materials arrive by truck, excavation work may continue in one area while pipe is being installed in another, and machines routinely travel between laydown yards, work fronts, access roads, and staging areas.
These conditions create substantial construction equipment hazards because workers cannot always predict where a machine will move next. A loader may reverse to collect another load, a telehandler may turn with materials elevated, or an excavator may swing into an area occupied by another crew.
Safe planning requires more than expecting pedestrians to stay alert. Equipment routes, pedestrian access, blind spots, staging areas, and work zones all need to be considered as the project changes.
Backover Accidents and Blind Spots
Many pieces of heavy equipment have substantial areas around the machine that the operator cannot see directly. Rear visibility may be limited by the equipment itself, while side blind spots can develop around tires, counterweights, booms, or attachments.
A backover accident can occur when a machine reverses toward a worker who is outside the operator’s field of view. Backup alarms and cameras may reduce the risk, but they do not eliminate it.
Spotters can be important when visibility is poor, but the operator and spotter must have a clear method of communication. If visual contact is lost, movement should not continue until the operator knows the path is clear.
Excavators and Swing-Radius Hazards
Excavators are common on LNG construction projects because extensive earthwork, trenching, grading, and underground utility installation may be required. Their rotating upper structure creates a dangerous swing radius that can extend beyond the tracks.
Workers positioned between the counterweight and a wall, vehicle, pile of material, or other fixed object can be crushed if the excavator rotates unexpectedly. Managing excavator risks requires controlling access around the machine and considering where workers must stand to perform related tasks.
A laborer should not be forced into a pinch point simply because the excavator operator needs assistance locating a utility, checking grade, or completing an excavation. The work should be organized so employees are not unnecessarily placed within the machine’s operating radius.
Forklifts and Telehandlers
Forklifts and telehandlers may be used to move pallets, pipe, equipment, and construction materials across LNG projects. Unlike equipment that remains within a defined excavation area, these machines can travel throughout the site and frequently encounter pedestrians.
Loads can obstruct the operator’s forward view, particularly when material is bulky or elevated. Turning with a raised load can affect stability, and uneven ground may increase the risk of tipping.
The condition of the travel surface also matters. Mud, potholes, temporary ramps, soft shoulders, and unfinished roads can affect braking and stability. Investigators should consider both operator conduct and whether the project provided a reasonably safe route for the machine.
Caught-Between and Pinch-Point Injuries
Some of the most severe heavy-equipment injuries occur when a worker is trapped between moving machinery and another object. A worker may be pinned between a loader and a truck, between a forklift and stored material, or between a machine and a fixed structure.
These events can cause devastating crush injuries even when the machine is moving slowly. The forces generated by heavy equipment can fracture bones, damage internal organs, destroy muscle tissue, or cause traumatic amputations.
An investigation should examine why the worker and equipment occupied the same space, whether the operator had adequate visibility, and whether the task required workers to enter a danger zone. Blaming the injured worker for being nearby can overlook the fact that the job itself may have required that position.
Equipment Condition and Maintenance Failures
Heavy equipment must be capable of stopping, steering, and operating predictably. Defective brakes, steering problems, worn tires, failed alarms, damaged cameras, hydraulic problems, or other mechanical conditions can contribute to serious injuries.
Maintenance and inspection records can reveal whether a problem existed before the accident and whether the machine should have been removed from service. When equipment failure is suspected, the machine should be preserved and inspected before significant repairs are made.
A defective component may also raise product liability issues if the failure resulted from the design or manufacture of the equipment rather than inadequate maintenance.
Traffic Control and Worksite Planning
Many heavy-equipment injuries are also failures of site organization. LNG projects may have temporary roads, material-delivery routes, pedestrian walkways, crane areas, excavation zones, and active work fronts that change from week to week.
A traffic plan that made sense early in the project may no longer be adequate after new structures, pipe racks, fencing, or stored materials restrict visibility and movement. Contractors should reevaluate traffic patterns as the site changes rather than relying on a plan created months earlier.
Depending on the work area, appropriate controls may include designated equipment routes, controlled crossing points, barriers, signs, spotters, lighting, and restrictions on pedestrian access to active equipment areas.
Multiple Contractors May Share Responsibility
Heavy equipment on an LNG project may be owned by one company, operated by another, and working under the direction of a general contractor or site manager.
Those arrangements can create third-party liability when another company creates or controls the hazardous condition. Responsibility may depend on who established traffic routes, who directed the operator, who maintained the equipment, and who had authority over the area where the injury occurred.
An LNG plant accident attorney may need to examine contracts, daily work plans, equipment ownership records, operator assignments, and the actual control exercised by the companies on site.
Evidence After a Heavy Equipment Accident
Heavy-equipment accident scenes can change quickly after emergency response. Machines may be moved, material repositioned, and traffic routes reopened before the investigation is complete.
Important evidence may include photographs, surveillance footage, equipment-camera video, telematics data, maintenance records, inspection documents, traffic plans, operator qualifications, daily reports, and witness statements.
A preservation letter can help protect video, electronic data, and maintenance information before it is overwritten or discarded. Depending on the circumstances, an equipment specialist or another expert witness may be needed to evaluate visibility, braking, machine condition, or site layout.
Injuries Caused by Heavy Equipment
Workers struck or pinned by heavy machinery can suffer fractures, internal bleeding, spinal trauma, traumatic brain injuries, nerve damage, and amputations. These injuries may require multiple surgeries, prolonged rehabilitation, or permanent restrictions.
A worker who cannot return to construction or industrial employment may experience a substantial loss of earning capacity in addition to significant medical expenses. Severe injuries may also require extensive future medical care and create lasting limitations in mobility and independence.
Speak With an LNG Plant Accident Lawyer After a Heavy Equipment Injury
Heavy-equipment accidents at LNG construction sites may involve blind spots, unsafe backing, poor traffic control, excavator swing hazards, defective machinery, unstable surfaces, or failures in coordination between contractors. Determining responsibility requires examining both the operator’s actions and the larger worksite conditions that placed workers and machinery in the same area.
Spagnoletti Law Firm represents workers and families affected by serious LNG plant construction accidents. Our LNG plant accident attorneys can investigate heavy-equipment injuries, preserve critical evidence, identify responsible companies, and evaluate personal injury claims.
If you or a loved one has been impacted by a heavy-equipment accident at an LNG construction site, call us. Contact Spagnoletti Law Firm at 713-804-9306 or contact us online for a free consultation. We handle injury cases on a contingency fee basis, meaning our clients do not owe attorney’s fees unless we recover compensation for them.